The PLN Crusher House building in Sawah Lunto, Padang has long been established and operated. This building is a building located in the PLN Sawah Lunto area. This building has been operating for about ± 26 years. Due to the increasing need, the Crusher House building structure was strengthened, followed by the replacement of the Crusher Machine with a greater tonnage load than before. Then PT Graha Survey was assigned to carry out a Dynamic Load Test with the aim of evaluating the effect of machine vibrations with structural reinforcement in the field.
The purpose of this examination is to determine the reaction of the building structure to the crusher machine that works in accordance with the plan. While the purpose of this activity is to get the influence of machines working on the building structure.
The objectives of this activity are:
- Get the speed, frequency, and acceleration values for structural and machine elements from the dynamic load test.
- Suggestions based on test results.