The Sampoerna Area Karawang Office Building has 4 Areas, namely Primary white (PP white), Secondary Primary White (SPM), Primary Processing (PP Kretek), Secondary Processing (SKM). Each building has a similar type of structure (typical). For the needs of maintenance activities in the upper structure area, for footing using a walk-able ceiling platform system. For this, the need for an assessment of the Karawang Sampoerna Area structure to determine the critical area of use of this system of the main structure as a reason for consideration of the safety access path when special conditions.
The purpose of this examination is to identify the effect of load walkable ceiling platform systems with building structures. While the purpose of this activity is to get the most extreme location conditions based on the structural calculation approach with the load attached to the field.
The objectives of this activity are:
- The safest location or protected area when there is an emergency or extreme condition (Example: earthquake), both for employees who work under the ceiling or who work on the ceiling
Route is safe working in a walk-able ceiling, - limiting the number of people who can work per walk-able ceiling segment
- Design vs. Review actual loading on the walk-able ceiling
- Other suggestions and input from the assessment results