Jakarta MRT, short for Jakarta Mass Rapid Transit, Moda Raya Integrated or Jakarta Mass Rapid Transit is a rapid transit transportation system using electric railroad that is being built in Jakarta. The construction process began on October 10, 2013 and is expected to be completed in March 2019..
The elevated line construction is almost complete and is ready for operation. However, to ensure the condition of structural elements in good condition as well as knowing the bridge’s response to the load acting on the structure and knowing the ability of the bridge to its service capacity, testing needs to be done. Tests carried out are static specific load testing and dynamic load testing. Static load testing by reviewing deflection of structures that will be later compared to service deflections allowed by the planner. While the dynamic load test is recording the dynamic behavior of the bridge when given a dynamic load on the bridge structure.
The purpose of this activity is to determine the capacity and strength of the strength of the bridge structure, so that the level of security of working load capacity (working load) can be responded to by the bridge structure. In addition, this test shows the condition of the existing structure to make it easier to determine the appropriate handling program if there is damage to the bridge structure under review.
While the purpose of this activity is to get recommendations for proper handling of the bridge structure.
The objectives of this activity are:
- Conduct evaluation of conditions from the results of visual inspection and loading test.
- Suggestions and recommendations based on the results of the loading test.